澳门威斯人游戏(中国)官方网站NO.1-One

400-9988-900
Pure Steam Generator


    Ø Pure steam is ready at shortest reaction time of less than 30 seconds from standby. TRUKING’s unique design ensures high quality Pure steam with efficient utility consumptions.

    Ø State of art pressure and temperature control with deviation range of ±5%. Efficient waste discharge at 2-8%.

    Ø Variable pressure online adjustment for Pure steam 2-5 bar, excellent design to meet dynamic peak load and faster reaction time.

    Ø Industrial PC control with state of art features for Audit trail, data integrity, Graphical debugging and remote access complying with 21 CFR Part 11 compliance.

    Ø Reliable operation of equipment, and stable water quality.



Onsite installation

Online message

join us

join us